Description of Project:





|
HART MIDDLE SCHOOL
- Design/Build emergency stabilization of exterior
walls/foundations and underpinning
- Phased while occupied
- Double crews during summer months
- Complete renovation and addition to this 170,000 sq.ft., 3 school
complex
- New reception lobby and theatre/stage/control room
- New gymnasium and athletic equipment
- New kitchens and cafeterias (2)
- New classrooms and administrative offices (26)
- Existing classrooms renovated (40)
- Restored exterior brick masonry, brick replacement/repointing
- Extensive site utilities and landscaping
- ADA upgrades
- Project completed five months ahead of schedule
RECONSTRUCTION OF MARTEN'S STADIUM/PAUL B. ROBISON
STADIUM
- Selective Removal of Trees
- Demolition of existing structures
- Regraded site contours
- Extensive underground utilities and track/field drainage
systems
- 10,000 seat Grandstand facilities
- Locker rooms, restrooms, food service, mechanical
rooms
- New press box and elevator
- All handicap accessible
- Regulation size football field; astroturf surface
- Rubberized perimeter running track and field events
area
- Extensive landscaping and parking facilities
- Project completed one month ahead of Schedule
ASHLAND ELEMENTARY SCHOOL
- Overall new site construction and building construction
- New 100,000 sq. ft. elementary school
- Steel frame with concrete decks, three stories
- All masonry exterior and interior
- New gymnasium
- New Cafeteria and full service kitchen
- Reception/lobby area
- Thirty (30) new classrooms
- New baseball field and activities areas
- Paved sports/play yard
- Substantial landscaping
- Rehabilitation of existing roadways adjacent to school
- Project completed one month ahead of schedule
ALTHEA GIBSON EARLY
CHILDHOOD EDUCATION ACADEMY
-
22,000 sq. ft. state of the art steel
and masonry facility
-
Accented by large glazed curtain
walls and clearstory windows
-
An award winning facility featuring
a plethora of building materials and textures in bold and primary
colors to peak a child's interest and senses
-
10 large multi-functional activity/classrooms
with toilet rooms
-
Each classroom pair interconnected
by a carpeted, light-filled, stepped story-telling area
-
Fully equipped nurse's station
-
Separate Guidance Counseling and
Testing wing
-
Glazed curtain wall multi-purpose
room
-
Multi-purpose room has all-purpose
flooring for athletic play or cafeteria use
-
Kitchen and an equipped stage area
is connected to the multi-purpose room
-
Project completed within 5 months
on a super-accelerated schedule
|