| Project Name: |
Additions & Renovations
to Bloomfield High School |
| Project Address: |
Bloomfield, NJ |
| Total Project Cost: |
$60,550,000 |
| Project Executive: |
Mark D. Hall |
| VP / Director of Construction:
| Scott V. Hall |
| Project Managers: |
Anthony F. Guerriero & Chris Wolf |
| Superintendent: |
Anthony Corrado / Richard Lefebvre |
| Architect's Name/Contact Person: |
Design Ideas Group - Jeff Venezia |
| Architect's Address: |
15 Bethany Street, New Brunswick,
NJ 08901 |
| Architect's Phone/Fax
Numbers: |
Phone: 732-249-6242 Fax:
732-247-1825 |
| Construction Manager: |
VTM Keith Thompson (Cell #: 908-208-7555) |
Description of Project:

|
- Additions & Renovations of a 475,000 sq.ft. high school
- 100+ classrooms
- 2 Cafeterias & Kitchens
- Extensive Kitchen equipment
- 2 New Gymnasiums built over an existing gymnasium
- Project situated on entire city block
- Five story high building with limited site access
- Extensive Asbestos Abatement / Lead Based Paint Abatement
- Extensive Building & Selective Demolition
- Extensive Cutting & Patching to Match Existing Finishes
- Extensive Site Utilities
- Concrete & Unit Paver Sidewalks
- Synthetic Running Track, Pole Vault & Long Jump
- Football & Baseball Fields
- Grandstands & Field House with Locker Rooms
- Extensive Turf/Landscaping
- Polished Concrete & Terrazzo Floor Finish
- Extensive Interior Architectural Millwork/Woodwork
- EPDM Roofing, Skylights & Roof Accessories
- Curtainwall & Window Replacement for the entire school
- Ceramic/Quarry Tile Finishes
- Wood Athletic Floors
- Resinous Floors & Laboratories
- Acoustic Baffles/Clouds & Sound Panels
- Acoustical Wall & Ceiling Treatments
- Painting & Vinyl Wallcovering
- Drywall & Plaster Finishes
- Visual Display Boards throughout
- New Restored Lockers throughout
- All New Signage
- New Stage Curtains / Rigging
- Photo Lab Equipment
- Basketball Backstops / Scoreboards / Volleyball Equipment
- Auditorium Theatre Seating
- Soundproof Rooms
- Electric Traction Elevator & Wheelchair Lifts
- Nine Phase - Owner Occupied Facility throughout construction
- Excavation/Dewatering - deep cut for new lower level
- Cast Stone & Brick Masonry Facades
- Site Amenities
- Structural Concrete Foundation & Retaining Walls
COMPLETION DATE: June 2007
|