| Project Name: |
NEW FIRST AVENUE
SCHOOL |
| Project Address: |
Newark, NJ |
| Project Contract Amount: |
$44,502,689 |
| Proj. Executive: |
Mark D. Hall |
| Project Manager: |
Anthony F. Guerriero |
| Superintendent: |
Roy Ralph |
| Owner's Name/Contact Person: |
NJ Schools Construction Corp./Neil
Hodes |
| Owner's Address: |
McCarther Highway, Newark, NJ |
| Owner's Phone |
Phone: 973/273-2990 |
| Construction Mgr./Contact Person: |
PB+3DI - Mr. Peter Sweeney |
| Construction Mgr. Address: |
375 McCarter Highway, Newark, NJ |
| Construction Mgr. Phone |
Phone: (973) 353-7610 |
| Architect's Name: |
Paulus Sokolowski & Sartor
Engineering - Mr. Robert Blakeman, AIA, LEED AP |
| Architect's Address: |
67A Mountain Blvd., Warren, NJ |
| Architect's Phone Number:
|
Phone: 732/560-9700 |
| Description of Project:
|
- Construction of a New Two-Story 183,000 sq.ft. Pre-K to 8 Elementary
School
- Construct under-building parking garage
- 46 classrooms above parking garage
- Cafeteria and kitchen
- Extensive kitchen equipment
- Project situated on an entire city block
- Two story high building with limited site access
- Excavation and dewatering
- Site amenities
- Structural concrete foundation and retaining walls
- Structural steel framed building
- Preformed metal roofing
- Thermoplastic membrane roofing
- Aluminum composite wall panels
- Precast stone
- Stone masonry walls
- Glazed block walls
- Seamless flooring and wood flooring throughout
- Extensive Architectural millwork and solid surface fabrications
- Insulated transulcent panel systems throughout
- Lockers
- Food service equipment - Full Kitchen
- Gymnasium and Stage equipment
- Luxury auditorium seating
- Wood laboratory casework
- Plastic laminate casework throughout
- Hydraulic elevator
- Window shades
- Sound conditioned rooms
- Chalk/Tack/Marker boards
- Telescoping gym seating
- Plumbing, Fire Protection, HVAC & Electrical Systems
- Geothermal heating and cooling system
Completion Date: November 2007
|
| |
|
| |
|